Most Read Research Articles


Warning: Creating default object from empty value in /var/www/html/sandbox.ijcaonline.org/public_html/modules/mod_mostread/helper.php on line 79

Warning: Creating default object from empty value in /var/www/html/sandbox.ijcaonline.org/public_html/modules/mod_mostread/helper.php on line 79

Warning: Creating default object from empty value in /var/www/html/sandbox.ijcaonline.org/public_html/modules/mod_mostread/helper.php on line 79

Warning: Creating default object from empty value in /var/www/html/sandbox.ijcaonline.org/public_html/modules/mod_mostread/helper.php on line 79

Warning: Creating default object from empty value in /var/www/html/sandbox.ijcaonline.org/public_html/modules/mod_mostread/helper.php on line 79
Call for Paper - May 2015 Edition
IJCA solicits original research papers for the May 2015 Edition. Last date of manuscript submission is April 20, 2015. Read More

Short-Term Electrical Load Forecasting for Iraqi Power System based on Multiple Linear Regression Method

Print
PDF
International Journal of Computer Applications
© 2014 by IJCA Journal
Volume 100 - Number 1
Year of Publication: 2014
Authors:
Firas M. Tuaimah
Huda M. Abdul Abass
10.5120/17492-8011

Firas M Tuaimah and Huda Abdul M Abass. Article: Short-Term Electrical Load Forecasting for Iraqi Power System based on Multiple Linear Regression Method. International Journal of Computer Applications 100(1):41-45, August 2014. Full text available. BibTeX

@article{key:article,
	author = {Firas M. Tuaimah and Huda M. Abdul Abass},
	title = {Article: Short-Term Electrical Load Forecasting for Iraqi Power System based on Multiple Linear Regression Method},
	journal = {International Journal of Computer Applications},
	year = {2014},
	volume = {100},
	number = {1},
	pages = {41-45},
	month = {August},
	note = {Full text available}
}

Abstract

In this paper an investigation for the short term (up to 24 hours) load forecasting of the demand for the Iraqi Power System would be presented, using a Multiple Linear Regression (MLR) method. After a brief analytical discussion of the technique, the usage of mathematical models and the steps to compose the MLR model will be explained. As a case study, historical data consisting of hourly load demand, humidity, wind speed and temperatures of Iraqi electrical system will be used, to forecast the short term load. Two models will be presented; one for winter and the second for summer season. Algorithms implementing this forecasting technique have been programmed using MATLAB and applied to the case study. This study uses the linear static parameter estimation technique as they apply to the twenty four hour off-line forecasting problem.

References

  • J. P. Rothe, A. K. Wadhwani and S. Wadhwani, "Short Term Load Forecasting Using Multi Parameter Regression", International Journal of Computer Science and Information Security (IJCSIS), Vol. 6, No. 2, 2009.
  • S. A. Soliman, and A. M. Al-Kandari, "Electrical Load Forecasting: Modeling and Model Construction", pp. 82-93, 2010.
  • S. A. Soliman, S. Persaud, K. El-Nagar and M. E. El-Hawary, "Application of Least Absolute Value Parameter Estimation Technique Based on Linear Programming to Short-Term Load Forecasting", IEEE, pp. 529-533, 1996.
  • Hesham K. Alfares and Mohammad Nazeeruddin, "Electric load forecasting: literature survey and classication of methods", International Journal of Systems Science, volume 33, No. 1, PP. 23±34, 2002.
  • Nahid-Al-Masood, Mehdi Z. Sadi, Shohana Rahman Deeba and Radwanul H. Siddique, "Temperature Sensitivity Forecasting of Electrical Load", The 4th International Power Engineering and Optimization Conf. (PEOCO), PP. 23-24, MALAYSIA, June 2010.
  • Nazih Abu-Shikhah, Fawwaz Elkarmi and Osama M. Aloquili, " Medium-Term Electric Load Forecasting Using Multivariable Linear and Non-Linear Regression ", Smart Grid and Renewable Energy, PP. 126-135, Vol. 2, 2011.
  • J. P. Rothe, A. K. Wadhwani and A. K. Wadhwani, "Hybrid and Integrated Approach to Short Term Load Forecasting", International Journal of Engineering Science and Technology Vol. 2(12), PP. 7127-7132, 2010.
  • M. Babita Jain, Manoj Kumar Nigam and Prem Chand Tiwari, "A Parameter based New Approach for Short Term Load Forecasting using Curve-fitting and Regression line method", International Journal of Engineering Research & Technology (IJERT) Vol. 1, August – 2012.
  • N. Amral, C. S. Özveren and D King, "Short Term Load Forecasting using Multiple Linear Regression", University of Abertay Dundee, UK 2007.